Products > Deadline anchor  
   

Deadline anchor  

* The deadline anchor is designed and manufactured in accordance with SY5320 and other technical standards

* The main loaded parts are made of good-quality alloy steel

* Each unit will be tested and inspected before delivery and detected with a non-destructive detector strictly according to the related standards.

Main technical specification for deadline anchor (weight indicator)

Model of weight indicator

Specification of deadline fixer

Max deadline pulling force (lbs)

Max load (lbs)

Deadline numbers

JZ250

JZG24

53000

530000

430000

10

8

JZ200

JZG20

44000

440000

350000

10

8

JZ150

JZG18

40000

320000

240000

8

6

JZ100

JZG15

33000

260000

200000

8

6

  

RG .Helps you to research and develop the Global petroleum and natural gas.
 


Home     |  Chinese  |  Russian  |  Contact Us   | 
Copyright © RG PETRO-MACHINERY(GROUP)CO.,LTD. All Rights Reserved.